EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
JerAmyRV-10
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (124)
Empennage
- (99)
-
Deburring of...
-
Deburring Tailcone
-
Tailcone disassembled
-
Tailcone...
-
Tailcone - nearing...
-
Update later - refer...
-
Drilled tail cone...
-
2nd tailcone top...
-
Skin deburring and...
-
Final drilled rest...
-
Final drilled left...
-
Drilling Right...
-
Drilling Left Longeron
-
Tailcone parts...
-
Assembled more of...
-
Finished riveting...
-
Attach the rudder...
-
Tailcone left skin...
-
Tailcone flip and...
-
Tailcone Right side...
-
Tailcone bottom -...
-
J-channel marking...
-
Finished cutting...
-
Fun with J-channels
-
Tailcone bulkhead...
-
Tailcone Work (pgs...
-
Tailcone initial...
-
Tapped the Tie Down...
-
Elevator Deburring...
-
More Elevator Skin...
-
Elevator Deburring...
-
Elevator deburring...
-
Deburring of...
-
Elevator assembly...
-
Right Elevator Top...
-
Invoice from Vans...
-
Right elevator top...
-
Quick drilling on...
-
Elevator Deburring...
-
Elevator Assembly
-
Elevators - Some...
-
Quick work on the...
-
Done with HS for...
-
HS Nose Ribs...
-
HS Riveting Continues
-
Quick rivets
-
Dimpling and...
-
HS Skin Dimples
-
Dimpling of the...
-
Machine...
-
Horizontal Spar...
-
Finally, some rivets!
-
Priming...at long last
-
Work on the...
-
Building E-903 and...
-
Elevator Rib Drilling
-
Elevators
-
Finished drilling HS...
-
Drilling Part 1 -...
-
Finished Cleco'ing...
-
Horizontal...
-
Putting the HS Ribs...
-
Simple bit of edge...
-
Nose Spar Debur...
-
Deburring and...
-
MCS on the HS Spar
-
Lots and Lots of...
-
Final Drilling and...
-
Working on HS-1008L/R
-
Assemble VS, Dimple...
-
Dimple VS skins and...
-
Rudder Dimpling,...
-
Rudder Work,...
-
VS Spar Riveting and...
-
Finished up rivets...
-
VS Rear Spar...
-
Dimpling and Rivets...
-
First Rivets on the...
-
Finished up Step 8...
-
Finished Rudder...
-
7-6 Leading Edge...
-
Rudder work - 7-6...
-
Rudder work - spar...
-
Vertical Stab Parts...
-
Work on getting VS...
-
Bit of Counter...
-
Inventory of some...
-
Cut Stiffeners and...
-
Prepped Rudder Parts
-
VS rib debur
-
Finished VS Skin...
-
Vertical Stabilizer...
-
Part Prep for VS...
-
Deburring of...
-
Vertical Stab - Work...
-
Inventory Completed
-
More inventory
-
Empennage Arrives...
-
Ordered Empennage Kit
Priming
- (1)
Tools
- (7)
Workshop
- (7)
Practice Kit
- (4)
Research
Wings
- (6)
Fuselage
Firewall
Interior Finish
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Paint / Decals
Inspection
Builder Name:
Jeremy Williams
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
212.8
Start/Last Date:
Feb 22, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=JerAmyRV-10
Home or Last Project Picture
Jul 31, 2023
Final drilled left side skin
- (.7 hour)
Category: Empennage
Finished the final-drilling of the left side skin today after work. Now I just have the right side and the under skin to final drill.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.